Description
PROJECT DESCRIPTION:
Design and construct a second elevated water tower as noted in the 2018 Water and Sewer Master Plan.
PROJECT BOUNDARIES:
Behind the new fire station located on S. Berlin Turnpike.
DEFICIENCIES AND NEEDS:
Fire flows and water supply need to be enhanced on the south side of Town.